We Want Your Feedback

We’re studying potential sites near Swift Current, Belle Plaine and south of Regina for 1 or more additional natural gas power stations.

We’re looking for your feedback to decide which sites are most suitable.

We want to know:

  • How do you want to exchange information with us?
  • Who else should we be talking with?
  • What potential impacts should we be aware of? How can we reduce impacts?
  • What environment and wildlife features are you aware of in the area? 
  • Are there future infrastructure plans we should note? 
  • What concerns do you have?


Please review the maps of the study areas and share your thoughts with us by completing the questions in our feedback form.

  1. Belle Plaine

  2. Rowatt area (south of Regina)

  3. Swift Current


How to Complete the Feedback Form


The feedback form asks questions to get more detailed feedback that is specific to each of the potential power station study areas. If you don't want to answer a particular question, please skip it and move on to the next question.

Questions About the Project


If you have questions about project, please email us.

Maximum 255 characters

0/255

Maximum 255 characters

0/255