Share Are there any power generation systems in operations where the electrons are not already fully committed?
Might there be a project where an algae cultivation project to utilize both the electrons and also use CO2 from plant operations would be considered?
We are looking for a pilot project partner for an application under the Alberta Government's ERA $40 Emerging Innovators SME EOI call (Dec 14,2023 deadline).
We are looking to scale up our technology under this or perhaps a Saskatchewan similar incentive, to demonstrate an effective ghg mitigation project that involves taking down CO2 under conditions of Direct Air Capture (DAC) and simply sequestering the biomass by pumping it into a deep reservoir or reutilizing the biomass for economic sustainability projects: low carbon fuels, SAF, food, livestock feed, biopesticides, etc. while also improving water quality.
ERA background report: https://eralberta.ca/wp-content/uploads/2017/05/B0150002_UofA_Food-Fibre-and-Bio_PUBLIC_Final-Report.pdf
on Facebook
Share Are there any power generation systems in operations where the electrons are not already fully committed?
Might there be a project where an algae cultivation project to utilize both the electrons and also use CO2 from plant operations would be considered?
We are looking for a pilot project partner for an application under the Alberta Government's ERA $40 Emerging Innovators SME EOI call (Dec 14,2023 deadline).
We are looking to scale up our technology under this or perhaps a Saskatchewan similar incentive, to demonstrate an effective ghg mitigation project that involves taking down CO2 under conditions of Direct Air Capture (DAC) and simply sequestering the biomass by pumping it into a deep reservoir or reutilizing the biomass for economic sustainability projects: low carbon fuels, SAF, food, livestock feed, biopesticides, etc. while also improving water quality.
ERA background report: https://eralberta.ca/wp-content/uploads/2017/05/B0150002_UofA_Food-Fibre-and-Bio_PUBLIC_Final-Report.pdf
on X (formerly Twitter)
Share Are there any power generation systems in operations where the electrons are not already fully committed?
Might there be a project where an algae cultivation project to utilize both the electrons and also use CO2 from plant operations would be considered?
We are looking for a pilot project partner for an application under the Alberta Government's ERA $40 Emerging Innovators SME EOI call (Dec 14,2023 deadline).
We are looking to scale up our technology under this or perhaps a Saskatchewan similar incentive, to demonstrate an effective ghg mitigation project that involves taking down CO2 under conditions of Direct Air Capture (DAC) and simply sequestering the biomass by pumping it into a deep reservoir or reutilizing the biomass for economic sustainability projects: low carbon fuels, SAF, food, livestock feed, biopesticides, etc. while also improving water quality.
ERA background report: https://eralberta.ca/wp-content/uploads/2017/05/B0150002_UofA_Food-Fibre-and-Bio_PUBLIC_Final-Report.pdf
on Linkedin
Email Are there any power generation systems in operations where the electrons are not already fully committed?
Might there be a project where an algae cultivation project to utilize both the electrons and also use CO2 from plant operations would be considered?
We are looking for a pilot project partner for an application under the Alberta Government's ERA $40 Emerging Innovators SME EOI call (Dec 14,2023 deadline).
We are looking to scale up our technology under this or perhaps a Saskatchewan similar incentive, to demonstrate an effective ghg mitigation project that involves taking down CO2 under conditions of Direct Air Capture (DAC) and simply sequestering the biomass by pumping it into a deep reservoir or reutilizing the biomass for economic sustainability projects: low carbon fuels, SAF, food, livestock feed, biopesticides, etc. while also improving water quality.
ERA background report: https://eralberta.ca/wp-content/uploads/2017/05/B0150002_UofA_Food-Fibre-and-Bio_PUBLIC_Final-Report.pdf
link
Are there any power generation systems in operations where the electrons are not already fully committed?
Might there be a project where an algae cultivation project to utilize both the electrons and also use CO2 from plant operations would be considered?
We are looking for a pilot project partner for an application under the Alberta Government's ERA $40 Emerging Innovators SME EOI call (Dec 14,2023 deadline).
We are looking to scale up our technology under this or perhaps a Saskatchewan similar incentive, to demonstrate an effective ghg mitigation project that involves taking down CO2 under conditions of Direct Air Capture (DAC) and simply sequestering the biomass by pumping it into a deep reservoir or reutilizing the biomass for economic sustainability projects: low carbon fuels, SAF, food, livestock feed, biopesticides, etc. while also improving water quality.
ERA background report: https://eralberta.ca/wp-content/uploads/2017/05/B0150002_UofA_Food-Fibre-and-Bio_PUBLIC_Final-Report.pdf
Stantheman
asked
over 2 years ago
We're aware of this technology, and are definitely keeping an eye on it. If and when it comes to commercial operation, it could an interesting low-carbon generation option. Until then, our mission is ensuring reliable, sustainable and cost-effective power for our customers and the communities we serve.
Share Main sources of Power?? on Facebook
Share Main sources of Power?? on X (formerly Twitter)
Share Main sources of Power?? on Linkedin
Email Main sources of Power?? link
Main sources of Power??
Beverly
asked
over 2 years ago
We rely on several power supply options to keep the lights on in Saskatchewan. Our current generating capacity includes:
- 39% - Natural gas
- 24% - Conventional coal
- 21% - Hydro and hydro imports
- 11% - Wind
- 3% - Other (flare gas, biomass, etc.)
- 2% - Solar
You can also view a daily snapshot of where your power comes here: Where Your Power Comes From (saskpower.com)
Share What is the earliest time that nuclear generation may be available in Sask. on Facebook
Share What is the earliest time that nuclear generation may be available in Sask. on X (formerly Twitter)
Share What is the earliest time that nuclear generation may be available in Sask. on Linkedin
Email What is the earliest time that nuclear generation may be available in Sask. link
What is the earliest time that nuclear generation may be available in Sask.
Dennis
asked
over 2 years ago
Thanks for your question. Our Small Modular Reactor (SMR) development project is in a multiyear planning phase to inform a construction decision in 2029. This would put Saskatchewan’s first potential SMR in service by 2034.
Share Hi as a millwright and someone who follows the power industry, I am wondering is there any talk off new hydro projects . I see that hydro Quebec and Ontario power are looking at new projects. Even Alberta has some hydro projects that are being evaluated, even pumped hydro.That being said is I guess cost is a big factor,site c foe example.Another question is there other refurbishment and up power projects ,due to new technology,besides eb cambel? on Facebook
Share Hi as a millwright and someone who follows the power industry, I am wondering is there any talk off new hydro projects . I see that hydro Quebec and Ontario power are looking at new projects. Even Alberta has some hydro projects that are being evaluated, even pumped hydro.That being said is I guess cost is a big factor,site c foe example.Another question is there other refurbishment and up power projects ,due to new technology,besides eb cambel? on X (formerly Twitter)
Share Hi as a millwright and someone who follows the power industry, I am wondering is there any talk off new hydro projects . I see that hydro Quebec and Ontario power are looking at new projects. Even Alberta has some hydro projects that are being evaluated, even pumped hydro.That being said is I guess cost is a big factor,site c foe example.Another question is there other refurbishment and up power projects ,due to new technology,besides eb cambel? on Linkedin
Email Hi as a millwright and someone who follows the power industry, I am wondering is there any talk off new hydro projects . I see that hydro Quebec and Ontario power are looking at new projects. Even Alberta has some hydro projects that are being evaluated, even pumped hydro.That being said is I guess cost is a big factor,site c foe example.Another question is there other refurbishment and up power projects ,due to new technology,besides eb cambel? link
Hi as a millwright and someone who follows the power industry, I am wondering is there any talk off new hydro projects . I see that hydro Quebec and Ontario power are looking at new projects. Even Alberta has some hydro projects that are being evaluated, even pumped hydro.That being said is I guess cost is a big factor,site c foe example.Another question is there other refurbishment and up power projects ,due to new technology,besides eb cambel?
curtiskutnikoff
asked
over 2 years ago
Thanks for your question! With our flatter terrain, Saskatchewan doesn’t have the same hydro resource as some other provinces. Many years ago, some of the most economic hydro resources were developed to provide electricity and will continue to provide power to Saskatchewan for the foreseeable future. There is some potential for future hydro development but there are several factors that impact the cost of hydro for Saskatchewan:
- Some of our project options are in northern Saskatchewan, far from where most of the power is needed (unless industrial demand from the northern mining sector increases)
- These, as well as the potential larger projects further south (e.g. Saskatchewan River and Churchill River systems) would need careful study to determine costs, impacts and benefits
- Hydro has high capital cost and takes years of investigation, design work and large up-front investments on specific projects to determine likely costs and impacts – development takes at least 12 years
- The environmental impacts make licensing hydro facilities challenging and, as with all new construction, Rightsholders and stakeholder interests must be considered
Pumped hydro is one of the low/non-emitting options that we’re considering for the future. One point to note is that pumped hydro as a whole is ultimately net negative in power generation. This is because the system uses more power pumping the water back up to the high reservoir than it generates by releasing the water through the turbine.
SaskPower has plans for life extension work at Coteau Creek Hydroelectric station in the coming years and at other facilities as equipment condition warrants. Options for adding generating capability at some existing facilities will be evaluated as well.